RFP - Mills Lane Storm Drain Improvements, CIP R20-02

The City Identified the need for a storm drainage system on Mills Lane from Highway 29 to the Napa River in the early 1970's and completed a design in 1974. This storm drain was later considered in the City's 2000 Master Plan of Drainage, identified in the City's Storm Drain Impact Fees and the 2005 Highway 29 Specific Plan and its Environmental Impact Repert (EIR) prepared in 2003 (SCH#2001082017). While the storm drain was considered in the above documents, the project was never implemented. No hydrological studies or environmental documentation have been done for the storm drain porject.
No files available